I don't know what guage the metal was, I hired a welder who had done this patch job numerous times. The metal he used looked to be about as thickness as the flighting on the auger. He patched about a foot in each trough and then crossed the seam where the actual holes had formed and then another inch or two. Rice is very abrasive and just eats up a machine, which means several patch jobs.